Shumway Construction / Remodel
August 15, 2004
Weather is hot – 85 to 90 degrees
Buildings C totally uncovered now
Buildings D and G still covered
Scaffolding going up on E and F buildings
Punchlist items being collected for C and D
Picture #1 – C building uncovered.........Picture # 2 – D (on left) is still under wraps
Picture #1 – H garage entry.........Picture # 2 – G building still covered
Picture #1 - Building G..................Picture # 2 - Building G
(Previous set of pictures)---
(Return to main page)